Keel laying for Hybrid Double Ended Ferry

published: 29.06.2016

Ceremony of keel laying for Hybrid Double Ended Ferry (project no. P310), second electric ferry in Europe, was held in Crist Shipyard on 28th June 2016.

Keel laying ceremony ...

The representatives of FinFerries (the Owner) and the Yard laid together the plaque and coins below the keel of the ferry designed by StoGda.

Keel laying ceremony ...  Keel laying ceremony ...  Keel laying ceremony ...

The ferry P310 is a modern unit with hybrid propulsion diesel. The ferry will operate the road between Parainen and Nauvo in Finland. A ship is ready for transport 90 cars and 372 passengers.

Hybrid Double Ended Ferry

StoGda is responsible for delivery complete design, including Contractual Design, Basic Design, model tank tests (including maneuverability lake test and ice tank tests), Workshop Documentation and As Built Drawings.

The ferry will be handed to the Owner on May 2017.